Abstract
In recent years, due to rising social welfare, the reliability has become one of most important topics of modern power network and electricity companies try to provide the electric power to the consumers with minimal interruptions. For this purpose, the electricity companies to improve the reliability ...
Read More
In recent years, due to rising social welfare, the reliability has become one of most important topics of modern power network and electricity companies try to provide the electric power to the consumers with minimal interruptions. For this purpose, the electricity companies to improve the reliability of the power system can utilize different techniques. In this paper, new developments occurred in electricity industry including integration of large-scale renewable resources, integration of large capacity energy storage systems, integration of combined heat and electricity units into power network and demand side response plans are taken into account, and these events impact on power network reliability is assessed. Power networks are affected with integration of renewable resources. Multi-state reliability models for renewable generation plants are obtained, in the paper. Suitable number of states in the proposed reliability model is selected by calculating XB index. Besides, fuzzy c-means clustering approach is utilized for determining probability of states. For study impact of energy storage systems with large capacity on power network reliability, load model is modified. To investigate effect of combined heat and power plants on power network reliability, failure of composed elements and produced thermal power are considered in reliability model of these plants. To evaluate demand side response impact on reliability of power network, the load model is modified. The effectiveness of the proposed techniques on the reliability enhancement of power network is satisfied using numerical results performed on reliability test systems based on the suggested methods.
Planing & Reliability
A. Ghaedi; R. Sedaghati; M. Mahmoudian
Abstract
In many different nations around the world, renewable energy sources are increasingly being used to generate electricity. It is because renewable resources are sustainable, have no operating costs, and are environmentally friendly. Wind power develops quickly among renewable units, and nowadays, several ...
Read More
In many different nations around the world, renewable energy sources are increasingly being used to generate electricity. It is because renewable resources are sustainable, have no operating costs, and are environmentally friendly. Wind power develops quickly among renewable units, and nowadays, several wind farms with large installed capacity are operating in the world. However, the erratic property of wind velocity causes generated power of wind parks to vary, which has an impact on various parts of electric network connected to wind parks and needs to be studied using new methods. In order to address reliability-based operation studies of electric network in presence of wind parks, the current research suggests a method taking into account both probabilistic and deterministic approaches for reserve scheduling. The PJM method has been modified for this reason, for incorporating wind production into the electric network. For wind farms, a several-state reliability presentation that considers hazard of assembled elements and change in produced power is developed at first stage. The appropriate amount of spinning reserve is then computed using matrix multiplication method through modified PJM methodology. Numerical simulations related to reliability test networks are provided for assessing efficacy of suggested methodology. It is concluded from numerical outcomes that the wind farms lead to the reduction of required spinning reserve. However, due to the variation of output power of wind farms arisen from variation of wind velocity, the impact of wind units in reduction of spinning reserve is less than the conventional units with the same capacity. Besides, spinning reserve calculated by well-being approach of wind farms that combines the probabilistic and deterministic indices is more accurate than the value obtained by risk indices.